Christmas is coming round fast, and so are the supplier cut-offs. To save you digging through a pile of supplier emails, we’ve pulled all the last order dates into one place.
All the dates below come straight from our suppliers:
Atlas Aluminium
Roof lanterns, roof lights, and lean-to roofs
Last delivery: Monday 21 December (depending on your delivery day)
Factory closed: Tuesday 22 December to Monday 4 January
Order by (stock colours):
Stock-size lanterns and flat roofs: Monday 7 December
Bespoke-size flat roofs: Monday 23 November
Bespoke-size lanterns: Monday 16 November
Special RAL colours: Monday 9 November
Lean-to and other bespoke roofs: get in touch and we’ll check with Atlas
Barbican
Last delivery: Wednesday 23 December
Lead times (working days):
Notts Collection, standard colour: 11 days
Notts Collection, premium colour: 13 days
Notts Collection, any RAL: 20 days
Premium Collection, standard colour: 9 days
Premium Collection, premium colour: 12 days
Premium Collection, any RAL: 12 days
For example, Premium Collection standard colour needs to be ordered by Thursday 10 December. Deliveries to Scotland, Cornwall, and Central London need an extra three working days.
Comp Door
Last delivery: Wednesday 23 December
Back open: Monday 4 January
Order by:
Custom-glazed products (sandblasted glazing, house numbers, etched designs, and other bespoke glazing): Friday 4 December
Standard products (standard glazed, stable, and French doors): Friday 11 December
These dates are based on delivery on 23 December. If you need your doors sooner, order earlier.
Cortizo
Order by (standard colours):
Cor Vision: Monday 16 November
Windows: Monday 23 November
Bi-folds: Monday 30 November
Special RAL colours will now be delivered after Christmas.
Deceuninck
Order by:
Special colours: Tuesday 3 November
All standard colours (including flush sash): Tuesday 1 December
Door-Stop
Last delivery: Monday 21 December
First delivery of 2027: Tuesday 5 January
Order by:
10-day products: Friday 4 December
5-day products: Friday 11 December
Eurocell and Rehau
Order by Friday 27 November for the best chance of delivery before Christmas, wherever you are in the country.
Orders placed by Friday 4 December may still arrive in time, depending on your area, but we can’t promise it. Anything ordered after that will be delivered in January.
Heads up for our Scottish customers: there are no deliveries to Scotland in the week before Christmas.
Korniche
Last deliveries: week commencing 14 December, with limited slots in the week commencing 21 December
First deliveries of 2027: week commencing 4 January
Order by 10am:
Standard colour lanterns, sliders, and internal glass partitions: Friday 27 November
All other standard colour products: Friday 4 December
Special colours: get in touch and we’ll check availability with Korniche. All Korniche dates depend on demand.
Morley
Integral blinds
Guaranteed delivery before Christmas:
All commercial and 16mm systems: order by Thursday 19 November
All 20mm systems: order by Thursday 26 November
Not guaranteed, but they’ll do their best:
Magnetic blinds: order by Wednesday 2 December
Other 20mm systems: order by Thursday 3 December
Smart
Smart Signature and Smart Designer doors: the last week to order for delivery before Christmas is the week commencing Monday 16 November.
Alitherm 400, Heritage, Visofold, and Visoglide
Last delivery: Monday 21 December (depending on your delivery day)
Order by:
Stock colours: Monday 30 November
Heritage doors and windows: Monday 23 November
Visofold (7+ panes) and Floating Corner Post: Monday 16 November
KL single colour: Monday 23 November
Floating Corner Post: Monday 9 November
Special RAL single colour: Monday 9 November
KL dual colour and Special RAL dual colour: the pre-Christmas cut-off has passed. Give us a shout and we’ll check what’s still possible.
Ordering astragal bars? Allow an extra five days. They’re available on everything except Visoglide Plus Patio.
Solidor and Residor
Last delivery: Monday 21 December (depending on your postcode)
First delivery of 2027: Tuesday 5 January
Order by:
Standard orders: Wednesday 9 December
Arches: the pre-Christmas cut-off has passed. Give us a shout and we’ll check what’s still possible.
Need a Hand?
Missed a date or need something urgently? Get in touch and we’ll see what we can do.
We’ll keep this page updated if any supplier changes their dates.